Pre-Paint Cleaner
Removes chalk and dirt from render. Paint bonds better. Longer life.
Al Salam Tower, Office 15B, Al Barsha, DubaiEvery day, 8am to 10pm
Paint, sealer and stain only last if they stick to a clean surface. Dust, chalky old paint, algae and grease all stop new coatings bonding. We wash and prepare walls, render, decks, metal and paving before painting or sealing, so the new finish lasts.
At a Glance
Ready to Paint
New paint and sealers only last on clean, sound surfaces.
We remove dust, chalk, algae and grease so coatings bond properly.
Preparation
| Surface | Before | Preparation |
|---|---|---|
| Painted Render | Repainting | Soft wash, chalk removed, algae treated |
| Timber Decks and Fences | Oiling or staining | Deck cleaner, brightener, rinse |
| Steel Gates and Railings | Repainting | Degrease, wash, loose rust removed |
| Paving and Concrete | Sealing | Deep clean, stains treated, fully dried |
Process
We look for chalking, peeling paint, algae and grease that will affect the new finish.
The right cleaner is applied to remove dirt, chalk, algae or grease.
All cleaner residue is rinsed off so it does not interfere with the coating.
The surface is left to dry fully before painting or sealing starts.
Peeling paint on Dubai villas is very often a preparation problem rather than a paint problem. Paint applied over dust or chalky old coatings loses grip in the heat and starts flaking within a year or two.
Washing also shows up cracks and damage that need repair before painting. Fixing them at this stage gives a longer-lasting result.
For painting, see villa exterior painting. For fences and gates, see fence repainting and sealing, and for decks, deck staining and sealing.
Pricing Guide
Preparation is priced per visit or by area.
*Prices shown are starting guides only. They vary and can change depending on your requirements, the size of the job, the surface, the materials and access to your building. You agree the final price before any work begins.
Small areas.
From AED 300*
Before repaint.
Quoted by area
Clean and brighten.
From AED 15*/m²
Gates and railings.
Quoted per item
Tools and Materials
Removes chalk and dirt from render. Paint bonds better. Longer life.
Kills growth before painting. No dark spots later. Clean finish.
Removes oils from metal. Primers stick. No peeling.
Prepares timber for oil or stain. Even colour. Better penetration.
Based in Al Barsha since 2014, we work across every Dubai community with trade-specialist technicians and a workmanship guarantee on every job.
Clean surfaces hold paint. Less peeling. Better value.
Cracks found before painting. Repaired first. Better result.
Thorough rinsing. No cleaner left behind. Coatings bond.
Our painters follow straight on. One schedule. No gaps.
Preparation washing starts from AED 300 per visit. Villa walls and large areas are quoted by size. Prices vary and can change depending on your exact requirements, the materials and access to the property, so the final price is confirmed after we see photos or visit.
Yes, when the pressure, nozzle and distance suit the surface. Paint, render, timber and soft stone need low pressure or a soft wash with cleaning solution, while concrete and interlock can take higher pressure. We test a small area first.
A typical villa facade takes one day. Large villas, high walls and heavily stained surfaces can take two days.
Yes. We use biodegradable detergents where cleaning solutions are needed, protect plants and drains, and avoid harsh acids on stone and render.
We prepare exterior surfaces for painting across Dubai.
Based at Al Salam Tower, Office 15B, Al Barsha First
Dubai Marina, JBR, JLT, Palm Jumeirah, Al Sufouh, Discovery Gardens, Al Furjan
Downtown Dubai, Business Bay, DIFC, Jumeirah, Umm Suqeim, Al Barsha, Tecom, The Greens
Arabian Ranches, Dubai Hills Estate, Emirates Hills, The Springs, The Meadows, Damac Hills, Motor City, Sports City, JVC, JVT, Town Square
Deira, Bur Dubai, Mirdif, Al Warqa, Silicon Oasis, Al Qusais
Send photos and we will quote the preparation wash.