Grey, Splintering Timber
Likely cause: UV breaking down the wood surface.
What we do: Deck cleaned, sanded and re-oiled or stained.
Al Salam Tower, Office 15B, Al Barsha, DubaiEvery day, 8am to 10pm
Decks in Dubai gardens, roof terraces and pool areas work in some of the harshest sun on earth. Timber greys and splits, screws back out, boards cup and joists rot where irrigation keeps them wet. We repair, refinish and build wooden and WPC decks so they are safe and look good again.
Starting Price
AED 250*
starting price for a deck repair visit
Outdoor Living
A good deck extends your living space outdoors for the cooler months.
We repair boards and frames, refinish timber and build new wooden and WPC decks.
Our Services
Choose a decking service for details, materials and FAQs.
Diagnose
Likely cause: UV breaking down the wood surface.
What we do: Deck cleaned, sanded and re-oiled or stained.
Likely cause: Screws backing out as timber moves.
What we do: Boards re-fixed with stainless deck screws.
Likely cause: Rot in boards or joists from trapped water.
What we do: Rotten boards and joists replaced.
Likely cause: Undersized joists or a sinking support.
What we do: Frame strengthened and supports reset.
UV is the main enemy of timber decks in Dubai. An unprotected hardwood deck turns grey within months and the surface fibres break down into splinters. Regular cleaning and oiling keeps the timber nourished and the colour rich.
Water is the second problem. Irrigation and pool splash keep the underside of decks damp, and joists rot from the top where boards sit. We check the frame on every repair, not just the boards you can see.
For outdoor carpentry, see outdoor woodwork. For cleaning, see deck washing, and for furniture finishing, wood furniture staining.
Pricing Guide
Repairs are priced per visit. Larger work is quoted per square metre.
| Job | Starting Price* | What Affects the Price |
|---|---|---|
| Deck Repair Visit | From AED 250* | Fixings and small repairs. |
| Board Replacement | Quoted per board | Timber or WPC. |
| Deck Oiling or Staining | From AED 35*/m² | Clean, sand and two coats. |
| New Deck | Quoted per m² | Material dependent. |
*Prices shown are starting guides only. They vary and can change depending on your requirements, the size of the job, the surface, the materials and access to your building. You agree the final price before any work begins.
Tools and Materials
Screws that do not rust or stain timber. They hold boards firmly. Ideal near pools and the coast.
Dense timbers such as ipe and bangkirai. They resist rot and wear. Beautiful with oil.
Composite boards with low upkeep. No splinters. Consistent colour.
Penetrating oil with UV filters. Colour lasts longer. Timber stays nourished.
Based in Al Barsha since 2014, we work across every Dubai community with trade-specialist technicians and a workmanship guarantee on every job.
We look under the boards. Rotten joists are found. The repair is safe.
New boards are matched to the old. Repairs blend in. Neat result.
UV oils and stains suit Dubai sun. The deck lasts. Less upkeep.
Repairs, refinishing and new decks. Consistent quality. Simple aftercare.
Deck repair visits start from AED 250. Board replacement, structural repairs and new decks are quoted per square metre or per job after inspection. Prices vary and can change depending on your exact requirements, the materials and access to the property, so the final price is confirmed after we see photos or visit.
Start by finding the cause: rotten boards, loose screws, a failed joist or a sinking support. Damaged boards are replaced, joists sistered or replaced, fixings renewed and the deck then cleaned and sealed.
Loose boards are usually caused by nails or screws that have backed out as timber moves in the heat. We remove the old fixings, replace them with stainless deck screws or hidden clips and replace any split boards.
In Dubai, timber decks usually need re-oiling or re-staining every 6 to 12 months because of strong UV. If water no longer beads on the surface or the colour has turned grey, it is time. WPC decks do not need staining, only cleaning.
A stain adds colour and UV protection, while a sealer repels water without changing the colour much. Many deck oils do both. In Dubai's sun, a pigmented stain or oil lasts longer than a clear sealer.
Areas We Cover
We repair and build decks in villas and terraces across Dubai, including Arabian Ranches, Emirates Hills, Palm Jumeirah and Dubai Hills.
We will tell you whether it needs repair, refinishing or replacement.