Townhouse
From AED 5,000*
Walls.
Al Salam Tower, Office 15B, Al Barsha, DubaiEvery day, 8am to 10pm
Townhouses from AED 5,000*
A full exterior repaint covers every wall, parapet, column and soffit, plus the boundary wall if you choose. We wash, repair and seal the whole villa, then paint top to bottom with acrylic exterior paint, so the house looks new from the street.
Process
We survey the villa, agree colours and help with community approval.
Walls are pressure washed, loose paint scraped and cracks filled.
Chalky and repaired areas are sealed so new paint bonds.
Two coats are applied from parapets down, then the site is cleaned.
Top to Bottom
A full repaint makes the whole villa look new from the street.
We wash, repair, seal and paint every exterior surface.
Guide
| Property | Typical Time | Starting Price |
|---|---|---|
| Townhouse | 4 to 5 days | From AED 5,000* |
| Three to Four-Bedroom Villa | 5 to 7 days | From AED 8,000* |
| Large Villa | 7 to 10 days | Quoted after visit |
| Boundary Wall Only | 1 to 3 days | Quoted per metre |
Painting from the top down means drips never land on finished work. Parapets and soffits go first, then walls, then columns and trims, and finally boundary walls.
We protect pools, paving, plants and cars before washing and painting, and clean the site each evening so the villa stays liveable.
For preparation details, see surface preparation. For coatings, see weather-resistant coatings, and for washing, pressure washing.
Pricing Guide
Full exteriors are quoted after a site visit.
From AED 5,000*
Walls.
From AED 8,000*
Walls.
Quoted per metre
Optional.
From AED 350*
Per item.
*Prices shown are starting guides only. They vary and can change depending on your requirements, the size of the job, the surface, the materials and access to your building. You agree the final price before any work begins.
Tools and Materials
Durable, UV-resistant colour. Breathable. Long lasting.
Binds old surfaces. Better adhesion. No peeling.
Protect windows, paving and plants. Clean site. No overspray.
Safe access to parapets. Even coverage. Professional.
Based in Al Barsha since 2014, we work across every Dubai community with trade-specialist technicians and a workmanship guarantee on every job.
No drips on finished walls. Clean result. Efficient.
Pools, plants and paving covered. No damage. Tidy.
You stay at home. Daily clean-up. Minimal disruption.
Community colours and paperwork. Compliant. Smooth.
Townhouse exteriors start from about AED 5,000 and standard villas from about AED 8,000, including washing, repairs and two coats of exterior paint. Large villas, boundary walls and specialist coatings are quoted after a site visit. Prices vary and can change depending on your exact requirements, the materials and access to the property, so the final price is confirmed after we see photos or visit.
Good quality exterior acrylic paint usually lasts five to seven years in Dubai, and elastomeric or premium UV-resistant systems can last longer. Walls facing west and south fade faster because of the strong sun.
We paint between October and April where possible, avoid midday sun on hot walls, and stop in high humidity, dust storms or rain, because paint applied in those conditions blisters, dries patchy or fails to bond.
We use exterior acrylic and elastomeric paints from brands such as Jotun, National Paints and Dulux, with UV resistance, anti-algae additives and heat-reflective options chosen for each wall.
Areas We Cover
We repaint villa exteriors across Dubai.
We will check walls, colours and approvals and quote.