Tanking System
Waterproofs floors and walls. Safe. Essential.
Al Salam Tower, Office 15B, Al Barsha, DubaiEvery day, 8am to 10pm
Retiling a whole bathroom changes it completely, but it is also where waterproofing matters most. We strip old tiles, repair and waterproof walls and floors, and tile the bathroom floor to ceiling with matched grout lines from floor to wall, neat cuts around fittings and clean silicone details.
Process
Old tiles and adhesive are removed and fittings protected or removed.
Walls and floor are repaired and tanked.
Grout lines are matched from floor to wall.
Grout, trims, silicone and fittings are completed.
When wall and floor tiles share a size or module, lining up grout lines where they meet looks considered and calm. We plan the layout before starting.
Most apartment bathrooms are retiled in three to five days, including waterproofing cure times.
For showers, see shower and tub tiling. For waterproofing, see waterproofing for tiled areas, and for repairs, cracked tile replacement.
Layout First
Floor and wall lines planned together.
Building Hours
Noisy strip-out follows tower rules.
Fresh Bathroom
A full retile transforms a bathroom.
We strip, waterproof and tile with matched lines.
Planning
Yes. Showers, bathrooms and balconies get a tanking membrane, sealed corners and pipe collars before tiling, plus correct falls to the drain.
Labour for floor tiling starts from AED 45 per square metre and wall tiling from AED 55 per square metre for standard porcelain and ceramic. Large format, mosaic and natural stone cost more because they take longer to set. Prices vary and can change depending on your exact requirements, the materials and access to the property, so the final price is confirmed after we see photos or visit.
A bathroom usually takes three to five days including waterproofing and curing. A kitchen splashback is often done in a day. Floors depend on the area and tile size.
Often, yes, if the old tiles are flat, firmly bonded and not hollow. We test them, prime with a bonding primer and use a suitable adhesive. Door heights and floor levels are checked first.
Pricing Guide
Priced per bathroom; tiles extra.
| Job | Starting Price* | What Affects the Price |
|---|---|---|
| Standard Bathroom | From AED 3,500* | Labour and materials. |
| Guest Toilet | From AED 2,000* | Labour and materials. |
| Strip-Out | From AED 800* | Old tiles removed. |
| Niche | From AED 300* | Per niche. |
*Prices shown are starting guides only. They vary and can change depending on your requirements, the size of the job, the surface, the materials and access to your building. You agree the final price before any work begins.
Tools and Materials
Waterproofs floors and walls. Safe. Essential.
Strong grip in wet areas. Lasting. Reliable.
Chosen for each area. Clean. Durable.
Mould-resistant joints. Flexible. Neat.
Based in Al Barsha since 2014, we work across every Dubai community with trade-specialist technicians and a workmanship guarantee on every job.
Tanking included as standard. Safe. Lasting.
Planned layout. Calm look. Premium.
Most bathrooms in a few days. Convenient. Organised.
Cuts, trims and silicone done well. Professional. Clean.
Areas We Cover
We retile bathrooms across Dubai.
Send photos and your tile choice for a quote.