Self-Levelling Compound
Flat, smooth base. Fast setting. Reliable.
Al Salam Tower, Office 15B, Al Barsha, DubaiEvery day, 8am to 10pm
Levelling from AED 30*/m²
Before any new floor goes down, the subfloor must be flat, dry and sound. We level concrete screeds and old tile floors across whole rooms and apartments with self-levelling compound, giving every floor finish, from SPC vinyl to glue-down LVT and tiles, the base it needs.
Requirements
| Finish | Typical Tolerance | Notes |
|---|---|---|
| SPC Click Vinyl | 3 mm over 2 m | Rigid core hides small bumps |
| Laminate | 3 mm over 2 m | Dips cause bounce |
| Glue-Down LVT | 2 mm over 2 m | Every bump shows |
| Large Format Tiles | 2 mm over 2 m | Prevents lippage |
Right Base
The subfloor decides how long the new floor lasts.
We test, prepare, prime and level whole rooms.
Process
The screed is tested so trapped moisture does not ruin the new floor.
Old adhesive is ground off and cracks repaired.
The base is primed for bond and to stop air bubbles.
Compound is pumped or poured and spread across the room.
New screeds in Dubai can hold moisture for weeks. Laying flooring too early traps it, causing mould under vinyl and swelling in laminate. We test before levelling.
Whole-room levelling gives a uniform base, which is better than patching dozens of small dips.
For local dips, see floor levelling for uneven surfaces. For timber subfloors, see subfloor reinforcement, and for parquet, parquet installation.
Pricing Guide
Priced per square metre by depth.
*Prices shown are starting guides only. They vary and can change depending on your requirements, the size of the job, the surface, the materials and access to your building. You agree the final price before any work begins.
Up to 5 mm.
From AED 30*/m²
5 to 10 mm.
From AED 45*/m²
Old floors.
From AED 15*/m²
Before levelling.
Included
Tools and Materials
Flat, smooth base. Fast setting. Reliable.
Checks screed dryness. Prevents failures. Essential.
Bonds and seals. No pinholes. Strong.
Release air from the pour. Smooth. Even.
Based in Al Barsha since 2014, we work across every Dubai community with trade-specialist technicians and a workmanship guarantee on every job.
No trapped damp. No mould. Lasting floors.
Uniform base. Better result. Neat.
Levelled to the right tolerance. Precise. Professional.
We can fit the floor after. One team. Simple.
Most click flooring needs no more than about 3 mm of variation over 2 metres. More than that and boards flex, click joints break and floors sound hollow, so we level first.
Yes, if the surface is flat, sound and dry. Floating laminate and SPC vinyl go straight over tiles with an underlay. Uneven tiles or concrete are levelled first.
A typical apartment bedroom is fitted in a day. A full two-bedroom apartment usually takes two to three days, plus drying time if the floor needs levelling first.
Laminate and SPC vinyl installation starts from AED 25 per square metre for labour, and from about AED 70 per square metre supplied and fitted. Levelling and skirting are quoted separately when needed. Prices vary and can change depending on your exact requirements, the materials and access to the property, so the final price is confirmed after we see photos or visit.
Areas We Cover
We level subfloors across Dubai.
Send photos and we will check and quote.