Skip to content
Wadi Al Muntaha Technical Services logo
Polished concrete floor

Levelling from AED 30*/m²

Subfloor Levelling in Dubai

Before any new floor goes down, the subfloor must be flat, dry and sound. We level concrete screeds and old tile floors across whole rooms and apartments with self-levelling compound, giving every floor finish, from SPC vinyl to glue-down LVT and tiles, the base it needs.

  • Levelling FromAED 30*/m²
  • MoistureTested
  • Whole RoomsYes
  • FinishesAny

Requirements

Flatness Needed by Floor Finish

FinishTypical ToleranceNotes
SPC Click Vinyl3 mm over 2 mRigid core hides small bumps
Laminate3 mm over 2 mDips cause bounce
Glue-Down LVT2 mm over 2 mEvery bump shows
Large Format Tiles2 mm over 2 mPrevents lippage

Right Base

Subfloors Levelled for Any Finish

The subfloor decides how long the new floor lasts.

We test, prepare, prime and level whole rooms.

  • Tested
  • Prepared
  • Primed
  • Levelled
Empty space with a smooth floor

Process

How We Level a Subfloor

  1. Step 1

    Test Moisture

    The screed is tested so trapped moisture does not ruin the new floor.

  2. Step 2

    Prepare

    Old adhesive is ground off and cracks repaired.

  3. Step 3

    Prime

    The base is primed for bond and to stop air bubbles.

  4. Step 4

    Level

    Compound is pumped or poured and spread across the room.

Moisture and Flatness

New screeds in Dubai can hold moisture for weeks. Laying flooring too early traps it, causing mould under vinyl and swelling in laminate. We test before levelling.

Whole-room levelling gives a uniform base, which is better than patching dozens of small dips.

For local dips, see floor levelling for uneven surfaces. For timber subfloors, see subfloor reinforcement, and for parquet, parquet installation.

Pricing Guide

Subfloor Levelling Cost in Dubai

Priced per square metre by depth.

*Prices shown are starting guides only. They vary and can change depending on your requirements, the size of the job, the surface, the materials and access to your building. You agree the final price before any work begins.

  • Whole-Room Levelling

    Up to 5 mm.

    From AED 30*/m²

  • Deeper Pours

    5 to 10 mm.

    From AED 45*/m²

  • Adhesive Grinding

    Old floors.

    From AED 15*/m²

  • Moisture Test

    Before levelling.

    Included

What You Get

What Our Subfloor Levelling Service Includes

Get a Quote on WhatsApp
  • Moisture tested
  • Flatness surveyed
  • Adhesive removed
  • Cracks repaired
  • Primed
  • Compound applied
  • Flatness checked
  • Clean-up

Tools and Materials

Tools, Materials and Products We Use for Subfloor Levelling

Self-Levelling Compound

Flat, smooth base. Fast setting. Reliable.

Moisture Meter

Checks screed dryness. Prevents failures. Essential.

Primer

Bonds and seals. No pinholes. Strong.

Spiked Rollers

Release air from the pour. Smooth. Even.

Why Choose Wamtech Services for Subfloor Levelling in Dubai

Based in Al Barsha since 2014, we work across every Dubai community with trade-specialist technicians and a workmanship guarantee on every job.

01

Moisture Tested

No trapped damp. No mould. Lasting floors.

02

Whole Rooms

Uniform base. Better result. Neat.

03

Any Finish

Levelled to the right tolerance. Precise. Professional.

04

Flooring Too

We can fit the floor after. One team. Simple.

Subfloor Levelling: FAQs

How Flat Does a Floor Need to Be for New Flooring?

Most click flooring needs no more than about 3 mm of variation over 2 metres. More than that and boards flex, click joints break and floors sound hollow, so we level first.

Can New Flooring Go Over Concrete or Existing Tiles?

Yes, if the surface is flat, sound and dry. Floating laminate and SPC vinyl go straight over tiles with an underlay. Uneven tiles or concrete are levelled first.

How Long Does Flooring Installation Take?

A typical apartment bedroom is fitted in a day. A full two-bedroom apartment usually takes two to three days, plus drying time if the floor needs levelling first.

How Much Does Flooring Installation Cost in Dubai?

Laminate and SPC vinyl installation starts from AED 25 per square metre for labour, and from about AED 70 per square metre supplied and fitted. Levelling and skirting are quoted separately when needed. Prices vary and can change depending on your exact requirements, the materials and access to the property, so the final price is confirmed after we see photos or visit.

Areas We Cover

Subfloor Levelling Across Dubai

We level subfloors across Dubai.

New Dubai and the Coast

  • Dubai Marina
  • JBR
  • JLT
  • Palm Jumeirah
  • Al Sufouh
  • Discovery Gardens
  • Al Furjan

Central Dubai

  • Downtown Dubai
  • Business Bay
  • DIFC
  • Jumeirah
  • Umm Suqeim
  • Al Barsha
  • Tecom
  • The Greens

Villa Communities

  • Arabian Ranches
  • Dubai Hills Estate
  • Emirates Hills
  • The Springs
  • The Meadows
  • Damac Hills
  • Motor City
  • Sports City
  • JVC
  • JVT
  • Town Square

Old Dubai and East

  • Deira
  • Bur Dubai
  • Mirdif
  • Al Warqa
  • Silicon Oasis
  • Al Qusais

Floor Ready for New Flooring?

Send photos and we will check and quote.